Mumbai · West

Chief Minister
BJP · in office since 2024
Declared figures from the ECI election affidavit (—), via MyNeta/ADR — as declared, not verified. Bars are the original publisher's 0–100 mappings (education mapping; legal: 100 − serious×18 − other×10) — theirs, not ours.
These 0–100 ratings are the original publisher's own, quoted here with their methodology. Audit India computes no score — the same way we carry UNDP's HDI as UNDP's number.
Transparency
38/ 100
the original publisher
Two CAG findings are carried here, both re-checked against the reports themselves in August 2026: the performance audit of MGNREGS (Report No. 7 of 2025) and the compliance audit of state revenues (Report No. 6 of 2025). The MGNREGS audit finds 8.70 per cent of households that worked getting the full 100 days, ₹2,268 paid against ₹34.85 lakh of unemployment allowance owed, and social audits falling short in 72 to 96 per cent of gram panchayats. The revenue audit finds ₹96.85 crore of tax not recovered before registrations were cancelled. The score stays low for India's wealthiest state.
Officials' Legal Integrity
87/ 100
the original publisher
10 unique officials with ECI affidavit data counted once each. CM Fadnavis: 2 cases/2 serious → 64; DCM Shinde: 4 cases/2 serious → 44; DCM Sunetra Pawar: 0 cases → 100 (replaced Ajit Pawar who died in a plane crash on 28 Jan 2026; sworn in 31 Jan 2026); Radhakrishna Vikhe Patil: 1 case/1 serious → 82; Girish Mahajan: 1 case/1 serious → 82; Speaker Narvekar, Uday Samant, Chandrakant Patil, Aditi Tatkare, Sudhir Mungantiwar: 0 cases → 100 each. Average: (64+44+100+82+82+100+100+100+100+100) ÷ 10 = 872 ÷ 10 = 87.2, rounded to 87. The Governor is excluded as an appointed position with no ECI affidavit. Provenance note: this score is the original publisher's and is left as published; the Raj Bhavan has since changed hands twice, C. P. Radhakrishnan leaving on election as Vice-President and Jishnu Dev Varma taking office on 10 March 2026. The officials list is the sitting council.
Governance
60/ 100
the original publisher
Composite: indicators avg (63/100) × 50% + Transparency (38/100) × 25% + Integrity (87/100) × 25% = 31.5 + 9.5 + 21.75 = 62.75; adjusted down to 60 to reflect the Palghar tribal malnutrition crisis, a governance-equity failure within 100 km of India's financial capital, and the state's record on rural employment — 8.70 per cent of working households getting the full 100 days, ₹2,268 paid against ₹34.85 lakh of unemployment allowance owed, and social audits missed in up to 96 per cent of gram panchayats.
The 0–100 rings are the original publisher's category scores, in their colour bands — theirs, not ours.
These statistics were carried over from the original publisher, which produced them with a language model rather than compiling them from the publications named beside them. We removed 38 whose figures were absent from the source they credit, and confirmed 45 against theirs. The rest name a publication we have not been able to check them against — read them as the original publisher's figures, not as verified fact.
Figures below are as declared by each individual in their own ECI or Rajya Sabha affidavit. We report them; we do not score them. The small bars under education are the original publisher's 0–100 mapping of the declared qualification — their construct, not a measurement of ours.
| Name | Office | Party · since | Declared cases | Declared qualification | Affidavit |
|---|---|---|---|---|---|
| DFDevendra Fadnavis | Chief Minister | ![]() | — | — | — |
| JDJishnu Dev Varma | Governor | — | — | — | — |
| RNRahul Narvekar | Speaker, Maharashtra Legislative Assembly | ![]() | — | — | — |
| SPSunetra Pawar | Deputy Chief Minister and Minister for State Excise, Sports & Youth Welfare and Minority Development & Aukaf | ![]() | — | — | — |
| RVRadhakrishna Vikhe Patil | Minister for Revenue & Agriculture | ![]() | — | — | — |
| ESEknath Shinde | Deputy Chief Minister & Minister for Urban Development and Public Works | ![]() | — | — | — |
| USUday Samant | Minister for Industries, Large & Medium Enterprises | ![]() | — | — | — |
| GMGirish Mahajan | Minister for Water Supply & Sanitation; Rural Development; Jal Jeevan Mission | ![]() | — | — | — |
| ATAditi Tatkare | Minister for Women & Child Development | ![]() | — | — | — |
| CPChandrakant Patil | Minister for Higher & Technical Education | ![]() | — | — | — |
| SMSudhir Mungantiwar | Minister for Forest, Cultural Affairs & Fisheries | ![]() | — | — | — |
Findings from CAG audit reports on schemes as they ran in this state, quoted with their report references. We add no grade of our own.
MGNREGS — Rural Employment Guarantee, Maharashtra
Of an average 117.98 lakh households registered under MGNREGS in Maharashtra, only 21.97 lakh — 19 per cent — demanded work at all. Of those, 99.73 per cent were offered employment. But of the 19.65 lakh households that actually worked, only 1.71 lakh — 8.70 per cent — got the full 100 days. The state has never conducted the baseline survey the scheme requires to assess how much work will be demanded and when.
What the audit measured
NREGASoft computed ₹34.85 lakh of unemployment allowance owed for failure to provide work over 2019-24; of that, ₹2,268 was paid. ₹5.88 crore of compensation for delayed wages was rejected by joint programme officers on grounds the Act does not provide for. Wages of ₹35.32 crore to unskilled workers were still unpaid in October 2024, and pending liability for skilled wages, material and taxes stood at ₹541.92 crore. Of 25.72 lakh works approved, 5.03 lakh were incomplete and 7.10 lakh had not started; another 3.03 lakh from before 2019-20 were still incomplete. Social audits fell short in 72 to 96 per cent of gram panchayats each year, and of ₹11.22 crore flagged in 1,084 misappropriation cases, recovery in 314 cases worth ₹4.44 crore was still pending.
State Revenues — Stamp Duty, GST and Excise
Maharashtra cancelled the GST registrations of 43 of 51 taxpayers examined — 32 of them classified as non-genuine and cancelled from inception — but the tax officers never took cognisance of the supplies those taxpayers had made in the intervening period, nor recovered what was due before cancelling. The audit puts the tax not recovered at ₹96.85 crore, plus interest.
What the audit measured
Five taxpayers who filed nil returns were shown by their own e-way bills to have made taxable supplies, making ₹3.53 crore recoverable. Nine more generated e-way bills for goods worth ₹4.90 crore without filing returns at all. In seven of 18 cross-state e-way bills examined, goods worth ₹10.59 crore never reached Maharashtra, leaving ₹1.56 crore of tax unverifiable. On stamp duty, misclassifying a document as an article of agreement cost ₹10.50 crore; undervaluing a single Mumbai property — assessed at ₹62.28 crore against a market value of ₹100.11 crore — cost ₹1.89 crore; an irregular one per cent concession cost ₹1.50 crore; and treating a renewable ten-year licence as a five-year one cost ₹29.71 lakh.
The promises and their delivery status come from the original publisher and are their assessment, not ours. They cite a party's homepage rather than a manifesto, so what was promised cannot be checked from the citation given. Audit India has verified neither the wording nor the status.
Ladki Bahin Yojana: increase monthly assistance to ₹2,100 for eligible women
Mukhyamantri Majhi Ladki Bahin Yojana launched pre-election July 2024 at ₹1,500/month — credited as a decisive factor in Mahayuti's landslide win. As of mid-2026, the promised ₹2,100 rate has not been implemented; 2.34 crore beneficiaries continue at ₹1,500. Budget strain (~₹46,000 crore/year at ₹2,100) cited for the delay.
Three free LPG cylinders per year for every eligible household
Announced as a supplement to PM Ujjwala beneficiaries. Implementation modalities not finalised; no cylinders delivered under this specific promise as of mid-2026. Existing PM Ujjwala subsidy continues separately through central government.
Farm loan waiver up to ₹2 lakh for all eligible Maharashtra farmers
Promised prominently in 2024 manifesto. No new comprehensive ₹2 lakh waiver programme launched by mid-2026; Mahayuti continued earlier limited schemes. Maharashtra has a history of incomplete farm debt relief; the 2017 waiver of ₹34,000 crore was still being processed years after it was announced.
Stabilise onion, soybean and cotton prices via dedicated state intervention fund
Maharashtra continued NAFED-linked procurement for onions and cotton MSP support. However onion prices crashed below ₹1,000/quintal in early 2025 triggering farmer protests, and soybean MSP lagged cost of production. No dedicated state price-stability fund created as specifically promised.
Namo Shetkari Mahasanman Nidhi: ₹6,000/year direct income support to all farmer families
Launched June 2023 (pre-election). ₹6,000/year in 3 instalments of ₹2,000 to 1.15 crore farmer families as a state supplement to PM-KISAN (so eligible farmers get ₹12,000/year combined). DBT to Aadhaar-linked accounts. GoMH expenditure ~₹6,900 crore/year. Widely credited alongside Ladki Bahin for Mahayuti's landslide November 2024 win. Among India's highest direct farmer income support by a state government.
Complete Mumbai Metro Lines 3 and fast-track Lines 9, 12, 14
Metro Line 3 (Aqua Line — Aarey–BKC–Cuffe Parade, 33.5 km) opened December 2024 under Mahayuti — a major milestone. Lines 2A and 7 operational since 2022. Lines 9, 12, 14 remain in pre-construction or early tender stage; no significant acceleration visible.
Mumbai Coastal Road Phase 2: extend northward to Kandivali
Phase 1 (Marine Drive–Worli, 10.58 km) opened March 2024. Phase 2 DPR approved for northward extension (~20 km to Kandivali); land acquisition and tendering underway. Completion expected 2027-28.
Create 1 crore employment and livelihood opportunities within the term
Magnetic Maharashtra 2023 summit drew ₹3.37 lakh crore in investment pledges (2,500+ MoUs). Formal employment growth attributable to state policy by 2026 estimated at 15–20 lakh — well short of 1 crore headline target. EV manufacturing, semiconductor and data-centre investments announced but in early stages.
Mukhyamantri Yuva Karya Prashikshan Yojana: ₹10,000/month stipend for 10 lakh unemployed youth aged 18–35
Announced pre-election October 2024; formally launched in phased manner from mid-2025. State pays ₹6,000/month, industry co-contributes ₹4,000 for a 6-month on-the-job training stipend. Target of 10 lakh beneficiaries. By mid-2026 approximately 2.8 lakh youth enrolled — industry participation uneven, with large corporates engaged but MSME uptake lagging. Critics note the scheme functions as a wage subsidy rather than structured skill training.
Mukhyamantri Annapurna Yojana: free food grain (rice/wheat) for 52 lakh families outside NFSA coverage
Launched October 2023 as a state supplement to the National Food Security Act (NFSA). Targets ~52 lakh families who hold yellow ration cards but fall outside NFSA entitlement; provides 5 kg of rice or wheat per member per month at no cost. GoMH annual expenditure ~₹6,500 crore. Scheme expanded in 2024 budget ahead of elections. Distribution through fair-price shops (PDS network); beneficiary identification linked to Aadhaar. Widely credited as a key welfare plank in Mahayuti's 2024 election campaign.
Implement Maratha reservation in jobs and education; restore OBC quota in local body elections
Maratha reservation (10% under SEBC Act 2024) remains under Supreme Court challenge as of mid-2026; stay on implementation upheld. The SC's 2021 judgment striking down the earlier SEBC Act (2018) has not been reversed; central government's request to include Marathas in OBC list pending at NCBC. OBC reservation in local bodies struck down by SC in 2021 (Vikas Kishan Gawali case) — constitutional amendment required to restore it, which the Centre has not tabled. Manoj Jarange-Patil-led agitation continued into 2026. This was the most politically charged promise in the Mahayuti manifesto and remains entirely unresolved.
Complete farm loan waiver for all distressed Maharashtra farmers
MVA (Nov 2019–June 2022) extended processing of the 2017 BJP farm loan waiver (₹34,000 crore) for remaining eligible farmers; ~18 lakh additional cases processed. Government collapsed in June 2022 before full implementation. No CAG audit of the 2017 farm loan waiver has been published, so no audited figure for ineligible or duplicate payments is carried here.
Remunerative prices for onion, cotton and soybean farmers via state mechanism
Onion prices crashed to ₹1/kg in November 2019 — within weeks of MVA taking office. NAFED procurement was deployed but volumes inadequate. Price crashes recurred in 2021. MVA failed to create a functional state price-stabilisation mechanism. Farmer distress remained acute in Nashik, Sangli and Marathwada throughout the term.
Cancel Aarey Metro car shed; protect 2,700 trees in Aarey Colony
Uddhav Thackeray's first act (Nov 2019): stopped Aarey tree-felling, cancelled car shed, shifted to Kanjurmarg. Shinde government reversed the decision in June 2022, reverted to Aarey with Supreme Court allowing resumption. The promise was honoured during MVA's tenure but subsequently undone by the successor government.
Accelerate Mumbai Metro Phase 3 (Aqua Line) without further delays
Line 3 construction continued but Kanjurmarg car-shed dispute (land ownership contest between Centre and Maharashtra) added ~18 months of delays. Supreme Court intervened. Line 3 ultimately opened in December 2024 under Mahayuti — nearly 4 years after the original 2020 target.
Maharashtra Shakti Act: death penalty for rape, fast-track courts for women's crimes
Maharashtra Shakti Criminal Law (Maharashtra Amendment) Act 2020 passed — provides death penalty or life imprisonment for aggravated rape and acid attacks; mandatory fast-track courts in each district. Passed with support of all parties. Considered MVA's most significant legislative achievement in its 2.5-year term.
Mahatma Jyotiba Phule Jan Arogya Yojana: expand health insurance to ₹5 lakh for all Maharashtra families
MVA government enhanced MJPJAY (earlier Rajiv Gandhi Jeevandayee Arogya Yojana) cover from ₹1.5 lakh to ₹5 lakh per family (April 2020), coinciding with COVID-19. 2.23 crore BPL and vulnerable families covered across 1,015+ government and private hospitals. Post-COVID cancer, cardiac and dialysis treatments especially benefited. Scheme merged with Ayushman Bharat in districts not covered under MJPJAY; GoMH contribution ~₹2,800 crore/year.
Fill 75,000 vacant state government posts; expedite Maharashtra Public Service Commission recruitments
MVA government initiated recruitment drives across education, health, police and revenue departments. COVID-19 (2020–21) severely disrupted MPSC exam schedules — exams postponed, answer-key controversies, court stays. Approximately 35,000–40,000 posts filled during the 2.5-year term, well short of 75,000. Backlog of unfilled positions handed over to Shinde government in 2022. MPSC reforms (new exam pattern, normalisation) announced but implementation incomplete.
Marathwada water grid and Vidarbha irrigation package: complete stalled irrigation projects; end farm distress
MVA revived the Marathwada Water Grid (linking Jayakwadi, Majalgaon and Sina-Kolegaon reservoirs) with fresh tenders after years of stalling; work progressed but completion deferred to 2024+. The Vidarbha Irrigation Backlog Authority (VIDB) received fresh allocations (~₹4,800 crore over MVA's tenure) — 38 projects advanced. The irrigation scam that preceded the MVA — the charge that very large sums spent on irrigation since 1999 barely moved net irrigated area — is not attributed to a CAG report here, because no such report is held. The structural problem was not resolved in 2.5 years; farmer suicides in Vidarbha continued at ~1,200/year through the MVA term.
Sakhi Mandal SHG programme: ₹1 lakh revolving credit to all women self-help groups; 10 lakh new SHG members
MVA expanded the Umeed Mission (Maharashtra State Rural Livelihoods Mission) SHG network. Credit linkage to banks improved; ~6.8 lakh SHGs active by 2022 (up from 5.4 lakh in 2019). However the ₹1 lakh revolving credit target was met for only ~60% of groups; rural bank NPA concerns and COVID disruptions slowed new disbursements. The 10 lakh new member target was approximately 70% achieved. Progress was genuine but short of promises.
Effective pandemic management; protect Mumbai's health infrastructure; no hospital profiteering
Maharashtra was India's worst COVID-affected state in both waves. First wave (2020): Mumbai's Dharavi — one of Asia's densest slums — was successfully contained through aggressive contact tracing, quarantining and door-to-door testing (the "Dharavi Model" was internationally cited). Peak first-wave daily cases: 11,000 (Maharashtra, July 2020) — highest in India. Official death toll: 1,47,855 (India's highest by state). Second wave (March-May 2021): hospitals overwhelmed; patients on roads outside BJ Government Hospital Pune; Nashik oxygen tanker leak (April 21, 2021) killed 24 ICU patients. Uddhav government imposed strict lockdowns — economically painful, kept numbers from being worse. Private hospital overcharging scandal: BMC and district courts received 12,000+ overcharging complaints. MJPJAY capping helped reduce some bills. No CAG audit of Maharashtra's Covid relief spending has been published, so no audited figure for procurement irregularities is carried here. Uddhav resigned June 29, 2022 — two months into India's worst COVID third-wave decline period.
Form a stable MVA government for the full 5-year term through alliance consensus
The MVA government (Shiv Sena + NCP + Congress, November 2019 – June 2022) lasted only 2 years 7 months — it collapsed when CM Uddhav Thackeray lost the Shiv Sena MLAs to a rebellion led by Eknath Shinde. Timeline: June 21, 2022 — 40+ Shiv Sena MLAs flew to Guwahati (BJP-ruled Assam) supporting Shinde. June 29, 2022 — Uddhav Thackeray resigned as CM and also vacated the official CM residence Varsha (an emotional moment — he had been a COVID patient himself). June 30, 2022 — Shinde sworn in as CM with Devendra Fadnavis as Deputy CM. Supreme Court later (November 2023) ruled the Shinde faction was "not unlawful" but refused to restore MVA; it allowed the 7th Schedule issue (Tenth Schedule anti-defection) to continue without compelling restoration of MVA. Election Commission recognised the Shinde faction as "official" Shiv Sena in February 2023, dealing a body blow to Uddhav. In November 2024 elections, Shinde's Sena won 57 seats vs Uddhav's Sena winning only 20 seats — vindicating Shinde's gamble. The MVA's policy promises were rendered impossible to fulfil when the government collapsed 2.5 years early.
Audit and complete irrigation projects; tackle the legacy of Maharashtra's irrigation scandal
The Maharashtra irrigation scandal — the charge that very large sums spent on irrigation between 1999 and 2012 raised net irrigated area by a fraction of a per cent — was associated with NCP's Ajit Pawar, then Deputy Chief Minister and Irrigation Minister, and the MVA government, which included him, inherited the liability. The Annual Technical Inspection Report for 2021-22 covers local bodies, not irrigation, so the figures once attributed to it here — a count of incomplete Marathwada projects, their value and their cost overrun — are not carried. Farmer suicide rates in Vidarbha and Marathwada remained above 3,000 per year through the MVA term — the irrigation deficit being a root cause. MVA allocated ₹4,800 crore to VIDB but structural reforms were not implemented.
2 CAG reports