Hyderabad · South

Chief Minister
INC · in office since 2023
Declared figures from the ECI election affidavit (—), via MyNeta/ADR — as declared, not verified. Bars are the original publisher's 0–100 mappings (education mapping; legal: 100 − serious×18 − other×10) — theirs, not ours.
These 0–100 ratings are the original publisher's own, quoted here with their methodology. Audit India computes no score — the same way we carry UNDP's HDI as UNDP's number.
Transparency
44/ 100
the original publisher
Two CAG findings are carried here, both re-checked against the reports themselves in August 2026: the performance audit of the Kaleshwaram project (Report No. 1 of 2024) and the performance audit of construction workers' welfare (Report No. 5 of 2024). The Kaleshwaram finding is among the most significant in Indian audit history — a project whose likely cost the audit puts above ₹1,47,427.41 crore against ₹81,911.01 crore projected to the Central Water Commission, with a benefit-cost ratio of 0.52 that makes it, in the auditor's words, economically unviable from the start. The incoming Congress government (Dec 2023) actively facilitated the audit against its BRS predecessor; the transparency score reflects this willingness but tempers it for the BRS administration's documented opacity on debt and expenditure.
Officials' Legal Integrity
98/ 100
the original publisher
10 unique officials counted (Governor excluded). CM Revanth Reddy: 1 case/1 serious → 82; all 9 others (Speaker Gaddam Prasad Kumar, Bhatti Vikramarka, Uttam Kumar Reddy, Tummala Nageswara Rao, Ponguleti Srinivas Reddy, D. Sridhar Babu, P. Sabitha Indra Reddy, Damodar Rajanarasimha, Komatireddy Venkat Reddy): 0 cases → 100. Average: (82+100×9) ÷ 10 = 982 ÷ 10 = 98.2, rounded to 98. TS Congress cabinet is remarkably clean — the one case against Revanth Reddy is legally contested (acquittal with revision petition). The BRS-era leadership (K. Chandrashekar Rao, K.T. Rama Rao) was not indicted despite multiple political controversies; the new Congress cabinet entered office with a strong integrity profile. Provenance note: this score is the original publisher's and is left as published. It counts P. Sabitha Indra Reddy, who is not in the council, and its per-official case counts do not all match the affidavit figures carried in the officials list below. The officials list, with portfolios taken from the state government's own council-of-ministers page, is the sitting council; the arithmetic above is not.
Governance
64/ 100
the original publisher
Composite: indicators avg (62/100) × 50% + Transparency (44/100) × 25% + Integrity (98/100) × 25% = 31 + 11 + 24.5 = 66.5; adjusted down to 64 to reflect: (1) Kaleswaram's structural failure — a ₹1.32 lakh crore project shut on structural safety grounds represents a massive allocation of public capital with minimal benefit delivery, and the off-balance-sheet debt burden constrains Telangana's future public spending; (2) Telangana power sector debt of ~₹1.6 lakh crore in DISCOM liabilities — second only to AP among south Indian states.
The 0–100 rings are the original publisher's category scores, in their colour bands — theirs, not ours.
These statistics were carried over from the original publisher, which produced them with a language model rather than compiling them from the publications named beside them. We removed 38 whose figures were absent from the source they credit, and confirmed 45 against theirs. The rest name a publication we have not been able to check them against — read them as the original publisher's figures, not as verified fact.
Figures below are as declared by each individual in their own ECI or Rajya Sabha affidavit. We report them; we do not score them. The small bars under education are the original publisher's 0–100 mapping of the declared qualification — their construct, not a measurement of ours.
| Name | Office | Party · since | Declared cases | Declared qualification | Affidavit |
|---|---|---|---|---|---|
| ARA. Revanth Reddy | Chief Minister | ![]() | — | — | — |
| SPShiv Pratap Shukla | Governor | — | — | — | — |
| GPGaddam Prasad Kumar | Speaker, Telangana Legislative Assembly | ![]() | 1 | 12th Pass | 2023 |
| BVBhatti Vikramarka Mallu | Deputy Chief Minister and Minister for Finance & Planning and Energy | ![]() | 3 | Post Graduate | 2023 |
| NUN. Uttam Kumar Reddy | Minister for Irrigation & Command Area Development and Food & Civil Supplies | ![]() | — | — | — |
| TNTummala Nageswara Rao | Minister for Agriculture, Marketing, Co-operation and Handlooms & Textiles | ![]() | 0 | Graduate | 2023 |
| PSPonguleti Srinivas Reddy | Minister for Revenue and Housing and Information & Public Relations | ![]() | — | — | — |
| DSD. Sridhar Babu | Minister for Information Technology, Electronics & Communications, Industries & Commerce and Legislative Affairs | ![]() | — | — | — |
| DRDamodar Rajanarasimha | Minister for Health, Medical & Family Welfare and Science & Technology | ![]() | — | — | — |
| KVKomatireddy Venkat Reddy | Minister for Roads & Buildings and Cinematography | ![]() | 6 | 12th Pass | 2023 |
| DAD. Anasuya Seethakka | Minister for Panchayat Raj & Rural Development and Women & Child Welfare | ![]() | — | — | — |
| KSKonda Surekha | Minister for Environment & Forests and Endowments | ![]() | — | — | — |
Findings from CAG audit reports on schemes as they ran in this state, quoted with their report references. We add no grade of our own.
Kaleshwaram Lift Irrigation Project
The Kaleshwaram project is likely to cost more than ₹1,47,427.41 crore against the ₹81,911.01 crore projected to the Central Water Commission. At the understated cost the benefit-cost ratio works out to 0.75; at the likely cost it is 0.52 — meaning every rupee spent returns 52 paise, which the audit says makes the project economically unviable from the start. Against a target of 18.26 lakh acres of new command area, works entrusted covered 14.83 lakh acres and the command area actually created was 40,888 acres.
What the audit measured
Of ₹86,788.06 crore spent up to March 2022, ₹55,807.86 crore — 64.3 per cent — came from off-budget borrowings raised by the project corporation. The State never approved the project as a whole; it issued 73 separate administrative approvals totalling ₹1,10,248.48 crore and never ordered a funding pattern. Seventeen works worth ₹25,049.99 crore were awarded before the detailed project report was approved. Raising the lifting capacity from 2 to 3 TMC a day added ₹28,151 crore. Re-engineering made work already done redundant, a ₹767.78 crore loss. Of 56 works, 12 were complete, 40 ongoing and four had not started. The audit says undue benefit of at least ₹2,684.73 crore to pump contractors cannot be ruled out, and a price adjustment clause added after tendering cost ₹1,342.48 crore.
Welfare of Building and Other Construction Workers, Telangana
Telangana's construction workers' welfare board was running with three members against the eight the rules require, and had prepared annual accounts only up to 2018-19 as of May 2023. Of ₹164.25 crore of labour cess collected by the seven sampled urban local bodies and one development authority, only ₹59.86 crore reached the Board — ₹104.39 crore, 64 per cent, stayed with the collecting bodies.
What the audit measured
The Board spent ₹32.43 crore on advertisements out of cess funds in 2017-19, despite a 2015 Supreme Court order and 2016 central instructions forbidding it. Of ₹1,004.82 crore advanced for Covid-19 relief on the State Government's direction, only ₹258.04 crore was actually spent on construction workers. Of 1,38,908 welfare claims, 83,736 were paid, 10,125 rejected and 45,047 left pending, with no record that rejections were ever communicated to the applicants. ₹51.47 crore was lost to dishonoured cheques and demand drafts that were never realised. The Andhra Pradesh board still owed Telangana's ₹431.94 crore nine years after bifurcation.
The promises and their delivery status come from the original publisher and are their assessment, not ours. They cite a party's homepage rather than a manifesto, so what was promised cannot be checked from the citation given. Audit India has verified neither the wording nor the status.
Where a CAG finding is quoted below, its figures have been checked against the report cited. Thirty-seven were withdrawn because the report they named does not exist or is a search page.
Free electricity up to 200 units per month for all domestic consumers
Congress launched Gruha Jyothi scheme: 200 units free per month for all household consumers. 91 lakh households benefit. However implementation had hiccups — first installments delayed by 3-4 months; BPL/non-BPL threshold disputes; Telangana DISCOM financial health (~₹60,000 crore debt) makes sustainability unclear. Scheme operational by mid-2024.
Mahalakshmi: ₹2,500/month to family homemaker and free bus travel for all women
Mahalakshmi scheme: free TSRTC bus travel launched for all women December 2023; ~15 lakh women daily. ₹2,500/month to homemakers ("Gruha Lakshmi") not implemented — Congress scaled back to free bus only, citing fiscal constraints. The ₹2,500 cash component remains pending as of mid-2026.
Farm loan waiver up to ₹2 lakh for all Telangana farmers
Congress announced a ₹2 lakh farm loan waiver; first phase disbursement started March 2024 covering 11 lakh farmers (₹6,200 crore released). Total estimated cost ~₹31,000 crore. As of mid-2026, ~15 lakh of the ~24 lakh eligible farmers have received relief. Process slower than promised due to bank data reconciliation issues.
Unemployed youth allowance: ₹4,000/month for graduates, ₹2,000 for intermediates
Yuva Vikasam unemployed youth allowance promised during campaign. As of mid-2026 the scheme is not launched. GoTS cited lack of beneficiary database, fiscal constraints from farm loan waiver and Gruha Jyothi expenditure. One of the most visibly unfulfilled 2023 guarantees.
Fill 2 lakh government vacancies within 1 year through transparent TSPSC recruitment
Congress government initiated Group-1, Group-2, and departmental recruitment through TSPSC. Approximately 35,000 posts filled by mid-2026; Group-1 provisional results declared March 2026. The 2-lakh-in-one-year target was never realistic — TS's actual sanctioned vacant posts are estimated at 1.1 lakh, and TSPSC exam cycles take 18-24 months end-to-end. BRS paper-leak legacy from 2022 (TSPSC Group-2 exam leak) continues to dog the board's credibility.
Rythu Bharosa: ₹15,000/year to all farmers including tenant farmers excluded under BRS
Congress Rythu Bharosa: ₹7,500 per season (Kharif 2024 first payment) to 40 lakh registered farmers — crucially including tenant farmers for the first time in TS history. BRS's Rythu Bandhu excluded tenant/sharecropper farmers who constitute ~25% of cultivators. By mid-2026, two instalments disbursed. Enhancement to ₹15,000/year (vs BRS's ₹10,000/acre) is meaningful for small farmers but disadvantages large landholders. Tenant farmer inclusion is the most substantive policy shift.
Probe Kaleshwaram irregularities and recover public money lost in BRS-era cost overruns
Congress appointed a Fact-Finding Committee (later upgraded to a Commission of Inquiry) in 2024 to probe Kaleshwaram Lift Irrigation Scheme irregularities. The CAG's 2024 performance audit had already put the project's likely cost above ₹1,47,427.41 crore and flagged structural concerns. Commission hearings are ongoing; no recoveries made as of mid-2026. KCR and key BRS officials served notices; several KLIS Corporation officials under investigation. High-profile probe but slow-moving.
CAG Performance Audit of the Kaleshwaram Lift Irrigation Scheme (Report 1 of 2024, Telangana): the audit found the project's cost is now likely to exceed ₹1,47,427.41 crore, against ₹81,911.01 crore projected to the Central Water Commission — an increase of 80 per cent.
Regularise all contractual employees in Telangana government; fill 80,000 government vacancies within 2 years
Congress 2023 Telangana manifesto committed to regularising all "outsourcing" and contract employees in government (estimated 1.2 lakh workers in municipalities, Singareni Collieries, TSRTC etc.). By mid-2026, ~42,000 contractual employees regularised with permanent status — primarily in municipal bodies and state corporations. The full 1.2 lakh target stalled due to fiscal constraints: regularisation implies permanent salary (₹35,000-50,000/month vs ₹15,000-18,000 contract). Government recruitment: TSPSC (Telangana State Public Service Commission) accelerated — 48,000 posts filled in 2024-25 (vs BRS's average 22,000/year). The 80,000 target in 2 years was not met (cumulative 48,000), but the pace is significantly above the BRS era. Contractual employee protests (by those not yet regularised) marked the mid-term of the Congress government.
Cheyutha scheme: ₹18,000 direct benefit/year to 9 lakh BC/OBC women; enhance SC Corporation funding
Cheyutha ("support" in Telugu) was Congress's most ambitious new welfare scheme for backward classes — ₹18,000/year (₹1,500/month) direct transfer to 9 lakh women from BC/OBC categories not covered by Dalit Bandhu or other targeted schemes. By mid-2026, 6.2 lakh beneficiaries enrolled and receiving transfers — 69% of target. Remaining 2.8 lakh: database verification pending (caste certificate issues and duplicate with other schemes causing exclusion). SC Corporation (Telangana SC Development Corporation): ₹3,000 crore corpus (up from BRS's ₹1,200 crore) — providing self-employment loans at 4% to SC entrepreneurs. 32,000 loans disbursed (2024-25). ST Corporation similarly enhanced. Key achievement: Congress extended the Dalit Bandhu (₹10 lakh/family) to 1.2 lakh additional Dalit households — slower than the BRS-era promise but continued.
Expand SHE Teams to all 33 districts; fast-track women's safety courts; free bus travel for all women
SHE Teams — Telangana's pioneering plainclothes women police units created by KCR in 2014 to deter eve-teasing and sexual harassment — are internationally cited as a best practice. Congress 2023 committed to expanding from 24 districts to all 33 and doubling team strength. By mid-2026: SHE Teams operational in all 33 districts; team strength increased from 1,400 to 2,200 personnel; 64,000 cases handled (2024-25). Free bus travel for women: TSRTC launched women's free bus scheme October 2023 — 28 lakh women beneficiaries/day (largest such scheme in AP/TS region). Fast-track courts: 8 new Mahila courts commissioned in 2024, reducing POCSO case backlog. Women's safety challenge: Hyderabad's rapid growth as a tech hub has attracted young women employees, and cases of cab/auto harassment increased — app-based reporting integrated with SHE Teams in 2025.
Expand Aarogyasri health cover to ₹25 lakh per family; include outpatient treatment; cover all 33 districts equally
Rajiv Aarogyasri (launched 2007 by Y.S. Rajasekhara Reddy) was the world's first government-funded health insurance scheme for the poor — and inspired Ayushman Bharat. BRS capped it at ₹5 lakh (₹10 lakh for specific diseases). INC 2023 expanded it as Rajiv Arogyasri 2.0: ₹10 lakh base + ₹15 lakh additional for critical illness (cancer, cardiac, renal, neuro). By mid-2026: 75 lakh families enrolled; 8.2 lakh treatments (₹4,800 crore claims settled). OPD inclusion (medicines, diagnostics up to ₹1,000/visit) piloted in 12 districts. No CAG audit of Telangana's health insurance scheme has been published, so no audited claims figure is carried here.
Build 20 lakh homes over 5 years under Indiramma Illu; ₹5 lakh per unit with open design choice; complete BRS's unfinished 2BHK backlog
Indiramma Illu (Indiramma's Home) — INC's housing promise — aims to complete what BRS left unfinished (2.89 lakh 2BHK of 10 lakh target) and add further homes. The scheme provides ₹5 lakh per unit (GoT ₹3.5 lakh + PMAY ₹1.5 lakh) to BPL families — without prescriptive 2BHK design, allowing beneficiaries to build to their own floor plan. As of mid-2026: 3.2 lakh units sanctioned, 1.1 lakh under construction, 28,000 completed. Challenges: urban land availability; contractor interest at ₹5 lakh barely covers 2024 material costs; 20% beneficiary own-funds requirement. No CAG audit of the Indiramma Illu scheme has been published.
Waive farm loans up to ₹2 lakh; replace Rythu Bandhu with Rythu Bharosa (₹7,500/acre including tenant farmers)
Two of Congress's most prominent Telangana 2023 promises: (1) Farm loan waiver: INC promised ₹2 lakh waiver within 10 days of taking office. Revanth Reddy government announced in December 2023. Cooperative bank loans (₹13,200 crore for 23 lakh farmers) being waived; nationalised bank waivers require RBI-GoI coordination. By mid-2026: ₹8,400 crore waived (64% of target). (2) Rythu Bharosa: replacing Rythu Bandhu (₹5,000/acre) with Rythu Bharosa (₹7,500/acre — 50% increase) AND including tenant farmers (excluded from Rythu Bandhu). Phase 1 (November 2024): ₹7,500/acre to 42 lakh registered landowners. Tenant farmer inclusion: 12 lakh tenants registered under Telangana Tenant Agricultural Practices Act (2024) — first payment pending.
Rythu Bandhu: ₹10,000/acre per season as investment support to all Telangana farmers
Rythu Bandhu (farmer's friend) was India's first direct income support to farmers based on land holdings — predating PM-KISAN. ₹10,000/acre/year (₹5,000 per Kharif and Rabi) paid to 58 lakh farming families; ~₹14,800 crore/year. Internationally recognised; replicated by other states. One of KCR's landmark achievements.
Mission Kakatiya: restore 1 lakh tanks and waterbodies to boost irrigation coverage
Mission Kakatiya: 47,000 tanks and water bodies restored or rejuvenated in 5 phases (2014-2023). Water storage increased in treated tanks; irrigation coverage of small and marginal farmers improved. However the 1 lakh figure was not reached; many restored tanks showed re-siltation within 3-4 years. No CAG audit of Mission Kakatiya has been published.
Kalyana Lakshmi / Shadi Mubarak: ₹1.01 lakh marriage assistance for SC/ST/minority girls
Kalyana Lakshmi (for SC/ST/BC) and Shadi Mubarak (for minorities): ₹1,00,116 marriage gift to eligible families. 3.5 lakh beneficiaries per year. Enhanced from ₹51,000 (2014) to ₹1,00,116 during the term. One of Telangana's most consistently delivered welfare schemes.
Dalit Bandhu: ₹10 lakh direct benefit to each Dalit family for entrepreneurship
Dalit Bandhu launched 2021 with ₹10 lakh per Dalit beneficiary for income-generation enterprise. As of the 2023 election, only ~48,000 beneficiaries covered out of ~15 lakh Dalit households. High per-beneficiary cost (₹10 lakh) makes universal coverage prohibitively expensive. BRS lost power before scaling the scheme; Congress government has slowed disbursal.
24×7 quality power to all agricultural and domestic consumers in Telangana
Telangana achieved 24×7 domestic power supply to urban areas — one of the best records among Indian states. Agriculture gets 9 hours/day (structured). Rural domestic supply is 20-22 hours. Some districts face load-shedding during peak summer. Overall TS power sector performance is above national average.
Mission Bhagiratha: safe piped drinking water to every rural household in Telangana
Mission Bhagiratha — one of India's most ambitious rural drinking water projects — delivered piped water to 56 lakh rural households across 18 districts by 2018, achieving near-universal coverage ahead of the national JJM programme. ₹43,791 crore invested. Fluoride and nitrate contamination villages were the priority. Independently verified by NABARD and World Bank observers. Among BRS's most concrete and delivered infrastructure achievements.
Kaleshwaram Lift Irrigation: irrigate 37 lakh acres and provide drinking water to 70 lakh people in North Telangana
Kaleshwaram Lift Irrigation Scheme (KLIS) — the world's largest multi-stage lift irrigation project — was KCR's signature infrastructure promise, formally launched June 2019. The CAG performance audit puts the cost projected to the Central Water Commission at ₹81,911.01 crore and the likely cost above ₹1,47,427.41 crore, and the command area actually created at 40,888 acres against a target of 18.26 lakh acres. Of ₹86,788.06 crore spent to March 2022, ₹55,807.86 crore came from off-budget borrowings raised by the project corporation — a contingent liability now borne by the state.
CAG Performance Audit of the Kaleshwaram Lift Irrigation Scheme (Report 1 of 2024, Telangana): the audit found the project's cost is now likely to exceed ₹1,47,427.41 crore, against ₹81,911.01 crore projected to the Central Water Commission — an increase of 80 per cent.
Aasara pension: ₹1,000/month to all poor elderly, widows, disabled and weavers
Aasara pension was one of TS's most valued welfare schemes — ₹1,000/month (enhanced to ₹2,016 by 2022) to 38 lakh beneficiaries across elderly, widow, disabled, toddy-tapper and weaver categories. Delivered door-to-door on the 1st of each month. The CAG performance audit of the scheme (Report No. 1 of 2023) found ₹535.39 crore of irregular or inappropriate sanctions, but the scheme's reach and regularity were acknowledged as strong. Congress continues the scheme under a different name.
CAG Report No. 1 of 2023 (Performance Audit of the Direct Benefit Transfer Scheme, Aasara Pensions, Telangana): irregular or inappropriate sanctions led to payments of ₹535.39 crore, of which ₹71.90 crore went to the Disabled category. ₹0.90 crore was paid against 367 deceased beneficiaries beyond their date of death. Cross-checking Transport Department data revealed ₹51.98 crore paid to beneficiaries owning four-wheelers, and Registration and Stamps data revealed ₹31.42 crore paid to 5,715 people who had registered assets worth more than ₹10 lakh. Sixteen per cent of the households the state's own survey found ineligible were nevertheless enrolled.CAG-flagged: ₹328 crore
2BHK Housing: two-bedroom houses for all urban poor and slum dwellers in Telangana
BRS 2BHK scheme: government-built two-bedroom homes for urban poor (PMAY-U supplemented). 2.76 lakh units sanctioned; ~1.93 lakh units completed and allotted by the 2023 election. Many of the completed units in peripheral areas lacked basic water supply, sewerage and road access for 1-2 years post-handover. Unit construction quality complaints were common. The scheme was one of India's largest state-funded urban housing programmes.
Make Hyderabad India's top IT destination; establish T-Hub as world's largest startup incubator; attract global tech majors
BRS (then TRS) transformed Hyderabad into India's second-largest IT hub — a remarkable achievement given the bifurcation shock of 2014 when Andhra Pradesh took half the state's economy. T-Hub (Technology Hub) — the world's largest startup incubator by physical space (Phase 2: 5.8 lakh sq ft, HITEC City) — hosted 2,100 startups by 2023; 12 unicorns, $4.8 billion raised. Key tech investments under BRS: Amazon India HQ (Hyderabad), Google's ₹7,500 crore data centre, Microsoft India HQ, Apple R&D centre. IT exports from Hyderabad: ₹1.75 lakh crore (2022-23) — 20% of India's total IT exports. HITEC City expansion: Phase 3 (WaveRock complex, Nanakramguda) added 2 crore sq ft of Grade-A office. ORR (Outer Ring Road) was the infrastructure enabler — 30 IT campuses located on ORR corridor. BRS's investor-friendly stance (single-window Telangana Industrial Services) and KCR's personal relationships with tech executives (trips to Silicon Valley, Dubai) directly contributed.
Provide ₹4,000/acre per season to all land-owning farmers without intermediaries — direct investment support
Rythu Bandhu (Farmers' Friend) — launched May 2018 before the December 2018 election — is India's first universal farm investment support scheme: a direct cash transfer of ₹4,000/acre/season (raised to ₹5,000/acre from 2019) into farmer bank accounts at the start of each Rabi and Kharif season for seeds, fertiliser and labour. Requires NO application, NO crop loss proof, NO intermediary. Scale: 58.33 lakh farmers, 1.53 crore acres enrolled (2022-23). Annual outlay: ₹15,000 crore (two seasons) — 15% of Telangana's total budget. Total payments 2018-23: ₹60,000 crore. Nationally cited as a model — 11 states followed. PM-KISAN (launched February 2019) is a derivative. Limitation: tenant farmers (25-30% of cultivators) are excluded — only land-owning farmers benefit. No CAG audit of Rythu Bandhu has been published.
Pipe safe drinking water from Krishna and Godavari to every rural household in Telangana by 2018
Mission Bhagiratha — one of the largest rural drinking water projects in Indian history — was the BRS government's flagship infrastructure promise. Launched 2016, completed (99.6%) by 2019. The scheme piped water from the Krishna and Godavari rivers to every rural household and habitation in Telangana: 2.53 crore rural people across 26,055 villages. Scale: 1.42 crore new connections, 36,000 km pipeline, 7,500+ overhead tanks. Investment: ₹43,791 crore (GoT + NABARD loans). By 2021, Telangana achieved 80.6% household tap water connectivity (NFHS-5) — significantly above the national 43.5% average. Remaining challenge: distribution pressure (last-mile delivery) and water quality, Nalgonda and Suryapet being historically fluoride-affected districts. Mission Bhagiratha won a United Nations Public Service Award (2018).
Provide free 2BHK (2-bedroom hall kitchen, 560 sqft) homes to all urban slum dwellers and rural landless; 3 lakh homes for Hyderabad
The 2BHK scheme — one of KCR's most ambitious welfare announcements — promised free two-bedroom homes (560 sqft) to all urban poor and rural landless in Telangana. Total target: 10 lakh homes (2 lakh/year for 5 years). As of 2023: ~2.89 lakh homes constructed and handed over — approximately 28% of target. Key challenges: (1) land acquisition in urban Hyderabad (slums on revenue, disputed, and lake-bed land); (2) contractor defaults; (3) infrastructure gaps in the completed colonies — internal roads, drainage and compound walls. Despite shortfalls, 2.89 lakh families moved from kutcha/temporary structures to permanent RCC homes. The Congress 2023 manifesto promised to complete the remaining 7+ lakh units under "Indiramma Illu". BRS's argument: no prior government had delivered this scale of dignity housing in Telangana.
2 CAG reports