Dehradun · North

Chief Minister
BJP · in office since 2022
Declared figures from the ECI election affidavit (—), via MyNeta/ADR — as declared, not verified. Bars are the original publisher's 0–100 mappings (education mapping; legal: 100 − serious×18 − other×10) — theirs, not ours.
These 0–100 ratings are the original publisher's own, quoted here with their methodology. Audit India computes no score — the same way we carry UNDP's HDI as UNDP's number.
Transparency
42/ 100
the original publisher
Two CAG performance audits published in 2025 are carried here, both read against the reports themselves: MGNREGS (Report No. 6) — one to four per cent of registered households got the full 100-day guarantee and no unemployment allowance was paid statewide over five years; and Smart Cities Dehradun (Report No. 5) — smart solutions bought and then left unused or unpowered. The score below was assigned by the original publisher on a different and larger set of findings, four of which could not be traced to any CAG report and have been withdrawn; treat the number as that publisher's opinion, not as a count of what is shown on this page.
Officials' Legal Integrity
100/ 100
the original publisher
10 unique officials counted (Governor excluded). All 10 — CM Dhami, Speaker Khanduri Bhushan, Prem Chand Aggarwal, Ganesh Joshi, Subodh Uniyal, Dhan Singh Rawat, Rekha Arya, Satpal Maharaj, Brij Bhooshan Gairola, and (10th) Arvind Pandey (Irrigation) — declared 0 criminal cases in 2022 ECI affidavits. Average: (100×10) ÷ 10 = 100. Computed by the original publisher from 2022 ECI affidavits. Two of the ten are no longer in the council of ministers — Prem Chand Aggarwal resigned in March 2025, and Brij Bhooshan Gairola is an MLA holding no portfolio — and both have been removed from the list above.
Governance
58/ 100
the original publisher
Composite: indicators avg (57/100) × 50% + Transparency (42/100) × 25% + Integrity (100/100) × 25% = 28.5 + 10.5 + 25 = 64; adjusted down to 58 to reflect: (1) the Joshimath land subsidence crisis, which halted work on the Char Dham corridor and displaced roughly 4,000 residents; (2) UK's ghost village crisis — 1,792 completely abandoned villages (Census 2011 ghost villages, likely doubled by 2024) — represents a 25-year governance failure to retain mountain populations through livelihoods; (3) UK has had 12 CMs in 22 years (2000-2022) — the political instability reflects the dominant-caste Brahmin-Kshatriya factional politics of the BJP's Garhwal-Kumaon divide.
The 0–100 rings are the original publisher's category scores, in their colour bands — theirs, not ours.
These statistics were carried over from the original publisher, which produced them with a language model rather than compiling them from the publications named beside them. We removed 38 whose figures were absent from the source they credit, and confirmed 45 against theirs. The rest name a publication we have not been able to check them against — read them as the original publisher's figures, not as verified fact.
Figures below are as declared by each individual in their own ECI or Rajya Sabha affidavit. We report them; we do not score them. The small bars under education are the original publisher's 0–100 mapping of the declared qualification — their construct, not a measurement of ours.
| Name | Office | Party · since | Declared cases | Declared qualification | Affidavit |
|---|---|---|---|---|---|
| PSPushkar Singh Dhami | Chief Minister | ![]() | — | — | — |
| GSGurmit Singh | Governor | — | — | — | — |
| RKRitu Khanduri Bhushan | Speaker, Uttarakhand Legislative Assembly | ![]() | 0 | Graduate | 2022 |
| GJGanesh Joshi | Minister for Agriculture & Rural Development | ![]() | 0 | 10th Pass | 2022 |
| SUSubodh Uniyal | Minister for Forest, Parliamentary Affairs & Technical Education | ![]() | 0 | Post Graduate | 2022 |
| DSDhan Singh Rawat | Minister for Health & Medical Education, School & Higher Education, Co-operation | ![]() | 0 | Doctorate | 2022 |
| RARekha Arya | Minister for Women & Child Development, Food & Civil Supplies, Sports | ![]() | 0 | Post Graduate | 2022 |
| SMSatpal Maharaj | Minister for PWD, Irrigation, Panchayati Raj, Tourism & Religious Affairs | ![]() | 0 | 12th Pass | 2022 |
Findings from CAG audit reports on schemes as they ran in this state, quoted with their report references. We add no grade of our own.
MGNREGS — Rural Employment Guarantee, Uttarakhand
Over 2019-24 the state spent ₹3,638.95 crore of the ₹3,647.21 crore available and gave wage work to 27.04 lakh households — but only one to four per cent of registered households received the full 100-day entitlement in any year, at an average of 21 days per household. No unemployment allowance was paid anywhere in the state across those five years, because the register of work demanded was not maintained in a single one of the Gram Panchayats audited.
What the audit measured
Registered households ranged from 10.35 lakh to 11.84 lakh; employment reached 4.72-6.54 lakh of them a year. Delays in releasing the Central and State share cost ₹2.03 crore in avoidable interest and left ₹122.40 crore outstanding for wages and materials. Of 200 job cards examined, 78 (39%) had no photograph and 50 (25%) no record of the dates worked. None of the selected Gram Panchayats conducted the mandatory annual door-to-door survey during 2019-24.
Smart Cities Mission — Dehradun
Smart solutions installed in Dehradun were dropped during execution or stopped working. A biometric and sensor-based solid waste module built in March 2022 for ₹4.55 crore sat unused until February 2025. Smart-school equipment costing ₹5.91 crore in three government schools stopped working because the schools could not pay the electricity bills it needed. E-rickshaws bought for ₹0.90 crore did not run for nearly two years.
What the audit measured
Also recorded: ₹2.62 crore wasted on environmental sensors and ₹3.24 crore on a multi-utility duct; ₹5.19 crore of irregularities in payments to the project management consultant; eight projects delayed 19 to 38 months; ₹1.41 crore in penalties for delay not enforced; ₹19.06 crore unutilised and not recovered from the implementing agency; ₹10.34 crore of cost escalation and ₹2.93 crore of work executed without inviting tenders. Audit also recorded genuine gains — traffic management, the command centre's public-safety handling, and the SCADA water-supply work.
The promises and their delivery status come from the original publisher and are their assessment, not ours. They cite a party's homepage rather than a manifesto, so what was promised cannot be checked from the citation given. Audit India has verified neither the wording nor the status.
Implement Uniform Civil Code (UCC) in Uttarakhand
Uttarakhand UCC Act passed unanimously by the state assembly February 2024 — India's first state to enact UCC. Covers marriage, divorce, inheritance and live-in relationships for all except Scheduled Tribes. Implementation rules notified; online registration portal launched. A historic constitutional milestone regardless of views on the policy.
1 lakh government jobs in Uttarakhand within the term
UKSSSC and UKPSC filled approximately 25,000-30,000 posts by 2025. Uttarakhand Subordinate Service Selection Commission faced paper-leak scandals (2021, 2022) causing significant delays. 1 lakh in one term is unrealistic for a small state; actual pace is ~7,000-8,000 posts/year. Patwari, forest guard, police and teacher recruitment completed.
Rishikesh-Karnaprayag rail project: complete by 2025 to connect Char Dham
Rishikesh-Karnaprayag Rail (125 km, ₹16,216 crore) is 64% complete as of mid-2026. 14 stations, 17 tunnels. Difficult Himalayan terrain causes delays; original 2024 completion target pushed to 2026-27. When operational, will connect Char Dham pilgrim circuit and transform mountain tourism.
Develop Char Dham highway: all-weather 4-lane access to Yamunotri, Gangotri, Kedarnath, Badrinath
Char Dham Pariyojana (925 km, ₹12,000 crore): significant stretches upgraded to 2-lane bitumen from previous 1-lane. 4-lane target faced opposition from NGT and Supreme Court (widening causes Himalayan landslides). SC-ordered 5.5m intermediate carriageway width limits construction scope. ~70% of originally planned upgrade completed in altered form.
Clean Ganga by 2024: zero untreated sewage into Ganga from Uttarakhand cities
Uttarakhand hosts the most sacred Ganga ghats (Haridwar, Rishikesh) and the river's source (Gangotri glacier). CAG's audit of the Namami Gange programme in Uttarakhand (Report No. 2 of 2025) concluded that sewage treatment plants were built without the household sewer networks that would feed them, that existing plants lack sufficient capacity — so untreated sewage still reaches the Ganga — and that Uttarakhand Jal Sansthan refused to take over 18 plants because of defects in their construction and operation. Forestry work reached only 16 per cent of its planned expenditure, crematoria built for the programme went largely unused, and safety audits were not conducted in time, which the report links to avoidable loss of life.
Expand MGNREGS to serve Uttarakhand's hill farmers and reverse-migration families
CAG's performance audit of MGNREGS in Uttarakhand (Report No. 6 of 2025) covers 2019-24. It found employment averaging 21 days per household per year against the 100-day guarantee, with only one to four per cent of registered households receiving the full entitlement in any year. No unemployment allowance was paid anywhere in the state across those five years — the register of work demanded was not maintained in any of the Gram Panchayats audited, so the allowance could not even be calculated. The wage rate was ₹230 per day in 2023-24.
Protect Uttarakhand's fragile Himalayan ecology; prevent land subsidence threats to hill towns
Joshimath (Chamoli district) — the gateway to Badrinath Dham and Auli ski resort — experienced severe land subsidence in January 2023, with 868 buildings developing cracks, 60+ buildings declared unsafe, and 3,000+ residents evacuated. The subsidence is attributed to decades of unregulated construction, hydropower tunnelling (NTPC's Tapovan-Vishnugad project tunnel passes beneath Joshimath), and a broken underground water channel. GoUK declared Joshimath a landslide-sensitive zone and stopped new construction. Compensation and rehabilitation of 3,000+ families remains incomplete as of mid-2026.
Complete Char Dham All-Weather Road; double pilgrim-tourist arrivals by 2025
The Char Dham All-Weather Road project (₹12,000 crore, 900 km connecting Rishikesh to Badrinath, Kedarnath, Gangotri, Yamunotri) was inaugurated by PM Modi in December 2016 and continued under BJP 2022. By mid-2026: 78% complete — the Rishikesh-Gangotri (276 km) and Rishikesh-Yamunotri (230 km) corridors are largely done; the Rishikesh-Badrinath segment (340 km) is 68% complete. The project faced a Supreme Court review in 2019-21 (Citizen's for Green Doon vs. Union of India) which temporarily restricted road width to 5.5m in ecologically sensitive stretches — reducing the all-weather capacity planned. Tourism: Char Dham pilgrim registrations — 46 lakh (2022), 38 lakh (2023, with Joshimath diversion reducing Badrinath flow), 52 lakh (2024). Kedarnath receives the most (22 lakh in 2024). Tourism generates ₹12,000 crore/year to Uttarakhand economy and 8 lakh jobs. A pilgrimage capacity regulation system (mandatory pre-registration since 2022) was introduced after the 2022 capacity crisis — too many unregistered pilgrims overwhelmed infrastructure.
Implement Uniform Civil Code in Uttarakhand — India's first state to do so
The BJP 2022 election promise of implementing Uniform Civil Code (UCC) in Uttarakhand — regulating marriage, divorce, inheritance and adoption uniformly for all citizens regardless of religion — was fulfilled when Uttarakhand became India's first state to enact UCC through the Uttarakhand Uniform Civil Code Act 2024 (passed January 2024; notified November 2024). Key provisions: minimum marriage age 18 for women, 21 for men (standardised); provision for registration of live-in relationships (controversial); uniform inheritance rights for daughters; mandatory marriage registration. Implementation: Dehradun pilot (January 2025) showed 68% compliance on marriage registration; UP and MP are watching the UK model closely before their own UCC decisions. Tribal communities (Jaunsari, Boksa, Raji, Bhotia — who have distinct customary laws under the Protection of Interests of Scheduled Tribes Act) are exempted from UCC provisions. This exemption reflects the BJP government's effort to politically manage tribal constituencies while implementing UCC in the mainstream.
5 lakh employment via industrial investment; expand Haridwar-Roorkee industrial corridor
Uttarakhand's industrial base is concentrated in the Terai belt: Haridwar-Roorkee-Rishikesh-Kashipur-Rudrapur (SIDCUL — State Industrial Development Corporation) industrial areas have attracted Patanjali Yogpeeth (₹10,000+ crore turnover, 15,000+ employees — Haridwar's largest employer), Hero MotoCorp (Haridwar plant), Hindustan Unilever, Nestle, Panasonic. The BJP 2022 Invest Uttarakhand summit (December 2023): ₹3.5 lakh crore in MoUs — of which ₹18,000 crore is in ground-breaking stage. EPFO-covered employment in Uttarakhand grew from 3.8 lakh (2022) to 4.6 lakh (2025) — net formal job addition of ~80,000, well below the 5 lakh target. Hill district employment remains the unresolved challenge — 90% of UK's industry is in plains Terai, while 70% of UK's population is in hills. The elephant in the room: UK's most celebrated entrepreneur is Baba Ramdev (Patanjali) whose Haridwar complex is UK's largest private employer — but a yoga-and-FMCG economy is not exactly the technology or manufacturing anchor the state needs.
Zero interest loans to farmers and enhanced MSP bonus for hill agriculture
Uttarakhand continued the central KCC scheme with interest subvention. State-level MSP bonus for basmati, mandua (finger millet) and jhangora (barnyard millet) announced but implementation was inconsistent. Hill farmers (small, fragmented holdings) remain economically marginalised with high migration to plains.
Anti-corruption drive: zero tolerance for corruption in public services
UK Vigilance Department registered 250+ corruption cases (2017-22). Online service delivery expanded via Aapda Mitra and e-district portals. However UK state ranked poorly in Transparency International surveys. Uttarakhand remains vulnerable to contract corruption in road/hydropower projects due to remote terrain making oversight difficult.
Rebuild Kedarnath devastated in the 2013 flash flood; restore pilgrimage and local economy
The June 2013 Kedarnath catastrophe killed 5,000+ pilgrims and washed away entire villages in Rudraprayag. BJP 2017 made Kedarnath reconstruction its flagship promise — Narendra Modi personally monitored the rebuild. By 2022 the Kedarnath shrine complex was fully reconstructed (new retaining walls, ghats, rest houses, Shankaracharya samadhi restored). Pilgrim numbers — 1.3 lakh/day at peak — returned to and exceeded 2013 levels. GoUK spent ₹1,800 crore in Kedarnath reconstruction; PMRF contributed. The Kedarnath recovery is widely considered a governance success story.
Reverse migration from Uttarakhand to plains: create employment in hills so youth stay
Uttarakhand has one of India's most severe outmigration problems — 1.7 lakh villages, of which 700+ are now classified as "ghost villages" (no permanent resident) and 4,000+ have population below 50. 40 lakh Uttarakhandis have migrated to Delhi-NCR, Dehradun plains, and other cities over the past 30 years. BJP's 2017 promise of reversing this trend through hill industry and tourism employment was not fulfilled. The 2020 COVID reverse-migration saw 2.5 lakh return — but most returned to plains once restrictions eased. Parvati (mountain goat) farming, natural farming, and remote-work promotion are GoUK's current strategies, but population drain from high-altitude villages continues.
Develop Gairsain (Bhararisain) as Uttarakhand's permanent capital or summer seat; shift governance to hills
Gairsain — a small town at 1,750 metres in Chamoli district, approximately equidistant from Kumaon and Garhwal divisions — was the original demand of the Uttarakhand statehood movement (1994-2000) for a hill capital that would symbolise governance for mountain communities rather than Dehradun (which sits in the foothills and is culturally closer to UP). BJP's 2017 manifesto promised to "develop Gairsain as the state's seat of governance." Trivendra Singh Rawat (CM 2017-21) declared Gairsain as the "summer capital" (Bhararisain district headquarters) on March 4, 2020 — Uttarakhand Foundation Day — giving it constitutional status as a temporary seat of the legislature. The state assembly has since met for summer sessions at Gairsain (2021, 2022). However: no secretariat shift occurred; all 26 government departments remain in Dehradun; only MLAs and the CM travel to Gairsain for the 5-7 day assembly session. Infrastructure at Gairsain — new assembly building (₹200 crore, inaugurated 2020), helipads, guest houses — was constructed. Hill activists argue the Gairsain declaration is symbolic; without administrative relocation, it does not deliver the governance proximity to hill residents that was the original demand.
Complete AIIMS Rishikesh; strengthen CHCs in hill districts; improve emergency response
AIIMS Rishikesh — sanctioned under PMSSY (Pradhan Mantri Swasthya Suraksha Yojana) and operational from 2012, with full 750-bed capacity reached 2019 — is Uttarakhand's apex medical institution and one of the country's busiest AIIMS outside Delhi (OPD 2,500+ patients/day). The BJP 2017 government's contribution: expansion of the Trauma Centre (major accidents on the Char Dham road corridors make this critical), construction of a new oncology block, and telemedicine links to 14 district hospitals. Hill CHCs: 42 Community Health Centres in UK's 13 districts — 28% of specialist posts vacant in hill CHCs (Chamoli, Uttarkashi, Pithoragarh, Bageshwar). Uttarakhand SDMRF (State Disaster Response Medical Force) established — 4 SDRF medical teams trained in high-altitude rescue. The annual Char Dham pilgrimage season (April-November) strains NHS capacity at Badrinath, Kedarnath, Gangotri valley hospitals — in 2022, 168 pilgrim deaths from cardiac events (exertion at altitude) and 42 from accidents along narrow mountain roads.
Improve government school quality; link ITIs to industry; free coaching for UKPSC/UPSC
Uttarakhand's government school system has 16,000 primary schools (Class 1-8) and 2,200 secondary schools (Class 9-12). A structural challenge: 900+ single-teacher schools in remote hills of Pithoragarh, Chamoli, Uttarkashi — entire schools in glacially isolated villages where the single teacher is often absent. Board exam (High School and Intermediate) pass rate improved under BJP: High School 78% (2022) vs 68% (2017); Intermediate 80% vs 72%. UKPSC (Uttarakhand Public Service Commission) recruitment was marred by controversy: the 2022 Forest Guard paper leak (question paper accessed before exam by candidates connected to coaching centre) required re-examination of 43,000 candidates — similar to HP's HPPSC scandal. The controversy damaged the BJP government's credibility on clean recruitment. ITI expansion: 28 new ITIs (Civil, Electrical, Plumber trades) opened in remote hill talukas under NSQF framework. Mukhyamantri Medhavi Chhatra Protsahan Yojana: free UKPSC coaching to 2,400 hill students at government cost.
Empower women through SHGs; promote Uttarakhand's homestay and handicraft economy
Uttarakhand's hill economy is structurally dependent on women — with large-scale male outmigration to plains, women constitute 60-70% of the active agricultural workforce and are the primary drivers of rural economic survival. BJP 2017 government's women empowerment programmes: (1) SRLM (State Rural Livelihoods Mission — Aajeevika UK): 3.2 lakh women organised into 28,000 SHGs; cumulative loan disbursement ₹2,800 crore (2017-22); (2) Homestay programme: 4,800 registered government homestays (GoUK subsidised construction — ₹1.5 lakh/unit for mountain villages); generated ₹180 crore tourism income (2022); (3) Pahadi products: GoUK supported branding of "Uttarakhand's own" products — mandua (finger millet) cookies, jhangora (barnyard millet) kheer, ringal (bamboo) handicrafts, Aipan artwork — sold through Uttarakhand state emporiums and e-commerce. Mukhyamantri Vatsalya Yojana (2021): ₹3,000/month to families of COVID-deceased with minor children — covering 2,100 beneficiary households.
Protect Uttarakhand's Himalayan glaciers; build flood-resilient infrastructure along rivers
Uttarakhand is among India's most disaster-prone states — every monsoon brings landslides, cloudbursts and flash floods. The June 2013 Kedarnath catastrophe (4,000-6,000 deaths) and the February 2021 Chamoli Glacial Lake Outburst Flood (GLOF — Rishi Ganga Power Project destroyed, 200+ workers missing) demonstrate the climate risk. BJP 2017 promise of "flood-resilient infrastructure" had limited implementation. NDRF (National Disaster Response Force) presence in UK: 4 NDRF battalions in Uttarakhand (increased from 2 under BJP). The Chamoli GLOF (2021) revealed that 3 illegal hydropower projects had been constructed without proper environmental safety studies in GLOF-prone valleys — regulatory failure predating BJP but unaddressed. Glaciology: Uttarakhand has 968 glaciers (including Gangotri, Pindari, Milam — India's most studied) losing mass at 0.4-0.8%/year. GoUK established a Glacier Research Cell at HNB Garhwal University (2020). However the fundamental tension between hydropower development (Uttarakhand has 45 hydropower projects, approved capacity 11,000 MW) and glacier/ecosystem protection remains unresolved.
2 CAG reports